PORTFOLIO

Roberto Clemente Park
Aquatic Spray Park

Project Location: Brentwood, NY
Client: Town of Islip

N&P was contracted by the Town of Islip to provide engineering services for the design and construction of the Roberto Clemente Park Aquatic Spray Park. All aspects of the Project were designed in accordance with the NYS Sanitary Code Subpart 6-1, NYS Sanitary Code Subpart 6-3, ADA Regulations, the Uniform Code and all other applicable regulations. Services were provided in phases and include:

DESIGN PHASE:

  • Assessment of the overall site, existing wading pool structures and mechanical equipment
  • Spray feature layout and design modifications based on Town input
  • Spray feature pad and spray pool design
  • Spray feature piping layout and design
  • Modification of existing surge tanks to recirculation tanks
  • New filtration system including chemical disinfection and, spray feature pumps, and controls
  • Obtain all necessary permits from regulatory agencies having jurisdiction
  • Attend multiple meetings with Town personnel for discussion of design and required actions

BID PHASE (UPON DESIGN APPROVAL):

  • Prepare construction cost estimate
  • Preparation of Bid documents including Town boilerplate
  • Attend Pre-Bid walkthrough to discuss project with potential contractors.
  • Review questions from potential contractors and provide answers in the bid addendum
  • Bid review and recommendation
  • Provide all other bid phase activities up to contract award

CONSTRUCTION PHASE (UPPON BID AWARD):

  • Review contractor shop drawings
  • Address contractor RFI’s
  • Provide daily site inspections of the Work
  • Coordinate all necessary inspections required by the SCDHS
  • Change Order review and processing
  • Contractor Claims for Payment processing
  • Attend bi-weekly meetings with Town personnel to discuss progress of the Work

PROJECT CLOSEOUT:

  • Upon completion of the Work, issue all required certifications for the constructed works to obtain permits to operate.

Relevant Project Components:

  • Preliminary & Final Design
  • SCDHS Permitting
  • Construction Plans & Specifications
  • Construction Cost Estimates
  • Bid Phase Services
  • Construction Support and Oversight